DIY doldrums

I’m in an uncomfortable stage right now. I have unfinished projects staring at me from all over, and I’m not liking what I see.

Usually, I try to be a one project kind of woman.

However, I currently have a mudroom that’s half-way through a makeover, a new feature in the kitchen that’s spawned other updates (mysterious, I know. I’ll have lots of posts soon), some outstanding finishing touches around the basement and the beginnings of a spring to-do list.

In the mudroom, the sticking point is the trim. We’ve stripped the wallpaper, patched holes, painted the walls, installed new baseboard, made an umbrella stand, built a bench, hung some hooks and fit out the closet with new shelving.

The baseboard is fully painted, but the window trim has just one coat and the trim around both doors and the closet is still the lovely flesh tone.

Mudroom painted Wythe Blue by Benjamin Moore

Trim painting is slow and tedious, and not my favourite way to spend my time. Some of the more appealing jobs that are also on the mudroom to-do list are refinishing the closet doors and staining the bench.

The basement bathroom is some trim (seems to be a theme), a drawer and a single hinge away from being finished. I bought the trim and the drawer guides–both for the built-in storage unit–at least a month ago. I hung the cabinet door on the built-in also about a month ago, but couldn’t get the hinges aligned properly, so it hasn’t swung smoothly in all this time.

Built in bathroom shelving

Building a drawer, painting and installing the trim and trying a new hinge would probably take less than one day. For a little amount of time, the satisfaction of finally crossing one room completely off the to-do list would be large.

In the rest of the basement, I’d really like to branch out beyond the TV area and begin to furnish and decorate the other rooms. These bigger to-dos are accompanied by smaller ones like fixing a shelf in the front hall closet and repairing the window screens (remember this one from the fall to-do list?) so they’re ready to install as soon as warm weather arrives. Oh, and then there are the mysterious kitchen fixes.

Fortunately this weekend, I have not just one day, not just two, but four thanks to the Easter holiday. I have grand ambitions for the next four days.

What are your plans for your weekend? Is it all about chocolates and family dinners, or do you have a project list too? Happy Easter, everyone, whatever you get up to.

Advertisements

5 thoughts on “DIY doldrums

  1. Julia, I laughed out loud because I too have many half started projects {or shall I be optimistic and say half completed lol} I love the “log” in the mud room how cute! Happy Easter to you, we will be spending it as a family with egg hunts and lots of food and candy 🙂

  2. It will feel so good to check off one complete room! I will be painting some door trim and baseboard tomorrow morning before heading to the in-laws’ for Easter dinner. There has been a lot of painting going on here this past week (we put a wall up and turned our dining room into a bedroom for Cooper). I can’t wait to complete his room so we can then move to other rooms around the house (it’s a domino effect).

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s