Garage construction has begun

Today is day four of garage construction. I am so excited to have this project underway. And our contractors have made so much progress already.

All of the brick is off the exterior of the pool, the deck inside has been demoed, the pool floor has been drilled for drainage, the new foundation has been excavated (without hitting the geothermal), we passed our first inspection, and footings have been poured. The patio around the outside of the pool and off the living room has been taken out. One tree has been taken down and cut up for firewood (half taken down by the excavator and the other half taken down by Matt’s Dad, who also did all the cutting up). Our pile of other firewood has been moved.

Two tractors (one a toy) in front of a pile of firewood
Child walking on dirt while a tractor digs in the background
Child standing on top of a pile of dirt
Child watching a cement truck pour cement

Next up is building the foundation for the garage extension and the mudroom dividing wall.

I ended up turning over the remaining demo to our contractors. I had really wanted to do a lot of the work myself. Demo is a relatively easy way for me to be involved, which is part of the fun for me. Plus it would save the contractors a bit of time.

But the deck turned out to be a beast. I took the railing off, then spent an hour and a half on the deck itself. I got four boards off and they all split.

Indoor pool mid demolition

I hadn’t taken any of the brick off the outside when the contractor said, “I can start next week.” He also said, “Scaffolding, jack hammers, three guys.” And I said, “You can do it.”

Removing the brick from a house

I am so glad I did. They were so quick. But they were also careful.

I want to use the lumber from the deck for Ellie’s playground expansion. And I want to save the brick for some future exterior work I have planned.

They took everything apart carefully. They stacked the lumber so I could take the nails out, and then moved it to the barn for me. They piled the bricks on skids and then tucked them behind the barn. Being able to reuse so much is so helpful.

Indoor pool mid demoltion
House with brick partially removed

And we’re already at the putting things back together stage. Though it’s going to take a while before it’s all back together. I’ll be sharing more as construction progresses.

Have you started any spring reno projects at your house? Do you have any renovation plans for this year? What jobs do you take on yourself versus hiring out? Have you ever reused lumber or other materials?

2 thoughts on “Garage construction has begun

    • The pool is staying… technically. It is super solid, so it’s actually going to be the footing for the mudroom wall. The rest is going to be filled with gravel, rebar and concrete (exact mix determined by an engineer). It’s all super exciting, and Ellie is loving it so far. She is very excited by the cement trucks, skid steer and excavator.

Leave a Reply to Jem Cancel reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.